RAM Analysis of the Boston LRV

RAM Analysis of the Boston LRV

Duration

28 months (ongoing project)

Description

CAF Turnkey & Engineering performs the analyses to demonstrate that the train meets the reliability and maintainability requirements, through predictive analysis during the design phase and statistical demonstration when the train begins to operate.